Sizing a Small Desalination System for Islands, Fishing Villages and Remote Sites
Islands, fishing villages, offshore platforms and remote construction sites share one problem: no municipal mains. Shipping water in is prohibitively expensive and rainwater harvesting is weather-dependent. A small RO desalination system is usually the realistic answer — but these projects have traps, and a badly specified unit becomes expensive scrap metal in the sun.
1. Step one: calculate demand properly
Do not size by feel. Add up per-capita use and each water duty:
- Domestic use: residents 100–150 L/person/day; crew 80–120 L/person/day;
- Kitchens and public facilities: add 20–30% of domestic demand;
- Cooling, washdown and other utility water: from actual equipment requirements;
- Leakage and losses: add 10%;
- Then add 20–30% margin for peak season, maintenance downtime and low feed temperature.
Example: a village of 50 people at 120 L/person/day needs 6 m³/day, so with losses and margin a 8–10 m³/day unit is right. Err on the generous side: RO output falls about 30% at low seawater temperature.
2. Step two: the intake decides the pretreatment
- Beach well or infiltration gallery — best water quality because the sand layer filters it: low turbidity, low biology, simplest pretreatment and longest membrane life. Choose this if the site allows.
- Direct surface intake — high suspended solids, algae and oil; multimedia plus ultrafiltration is mandatory, and the intake must avoid aquaculture zones, sewage outfalls and vessel discharge areas.
- Intertidal intake — heavy sand and silt load; needs a settling pit and coarse screening, and the intake head must be designed against blockage.
3. Step three: equipment configuration
| Module | Typical small system (1–20 m³/d) |
|---|---|
| Intake | Submersible or self-priming pump, seawater strainer, sand trap |
| Pretreatment | Multimedia filter (auto backwash), 5 µm cartridge, antiscalant dosing |
| Desalination | High-pressure plunger pump, seawater membrane array, energy recovery (recommended as standard) |
| Post-treatment | UV sterilisation; remineralisation / pH adjustment for drinking water |
| Control | PLC, low-suction protection, overpressure protection, 4G remote monitoring |
| Construction | Containerised or skid-mounted, heavy anti-corrosion coating for salt spray |
4. Step four: storage, power and discharge
Storage. Provide one to two days of demand in a food-grade PE or stainless tank. This lets the plant run during cheap-tariff hours or peak solar output instead of 24 hours a day.
Power. Small systems have high starting current, so generator capacity should be 2–2.5 times the rated high-pressure pump power — otherwise the breaker trips on every start. Where solar or wind is available, a PV + battery + RO off-grid arrangement can cut running cost by more than half: make water by day, use stored energy at night.
Brine discharge. Choose a well-flushed location away from coral, aquaculture and the intake's downstream recirculation zone. Submerge the outfall below 2 m and fit a diffuser — this is a hard requirement in most environmental approvals.
5. Five mistakes we see repeatedly
- Specifying it like a mains-water plant. Seawater is extremely corrosive; a carbon steel frame rusts through in a year. Heavy coating or 316L is essential.
- No spare cartridges. Resupply to an island is slow; a cartridge stock-out means a shutdown. Keep 6–12 months of consumables on site.
- Unattended operation without remote monitoring. Faults are found late and small problems become overhauls.
- Ignoring typhoon and salt spray. Equipment and control cabinets need sun, rain and salt protection, mounted above the historical high-tide level.
- No operator training. Even good equipment fails within three months if nobody performs backwash and reads the pressure gauges. Train on delivery.
Shenzhen Duruofei Technology Co., Ltd. supplies skid-mounted and containerised desalination systems from 1 to 200 m³/day for islands, fishing villages and offshore platforms, configurable for off-grid solar operation, with installation, commissioning and operator training included. We ask for a water analysis report and a demand schedule up front — those two documents decide whether the design is right first time.
Need a system sized for your site?
Send us the feed water source (seawater / brackish / tap), daily demand and installation location, and we will come back within 24 hours with a configuration and quotation.
Talk to an engineer