“What does a cubic metre of desalinated water cost?” It is the most frequently asked question we get, and the most often answered vaguely. The industry figure is roughly USD 0.55–1.00/m³, and the spread is wide because cost depends heavily on plant size, electricity tariff and feed water quality. Break the number open and you can see where your project will land.

1. Five components make up the cost

Electricity — 40–55%

The largest single item. RO specific energy is 3–4 kWh/m³ with energy recovery, 5–8 kWh/m³ without. At USD 0.10/kWh that is USD 0.30–0.80/m³. Over ten years, the difference between fitting and omitting energy recovery is roughly the price of another machine.

Membranes and cartridges — 15–25%

Seawater membranes last 3–5 years; amortised, that is USD 0.06–0.13/m³. Cartridges are changed every 1–3 months and multimedia media topped up every 3–5 years. This line is driven almost entirely by feed turbidity and how well pretreatment is designed.

Chemicals — 5–10%

Antiscalant, biocide and reducing agent, budget USD 0.03–0.07/m³. Do not economise here: halve the dose and you may halve membrane life.

Labour and maintenance — 10–20%

Small plants can run unattended with periodic inspection; large plants need full-time operators. The smaller the plant, the higher labour cost per cubic metre.

Depreciation and capital charge — 15–25%

Straight-line over a 10–15 year equipment life, plus civil works, intake and outfall.

2. Realistic ranges by plant size

CapacitySpecific energyAll-in water costComment
10 m³/d (marine / single island)3.5–5 kWh/m³USD 0.85–1.70/m³Depreciation and labour spread thin; highest unit cost
100 m³/d (village / small factory)3–4.5 kWh/m³USD 0.65–1.00/m³The sweet spot for value
1,000 m³/d and above (park / municipal)3–3.8 kWh/m³USD 0.55–0.85/m³Clear scale effect; better power tariff negotiation

For reference, long-distance water transfer to China's coastal cities costs roughly USD 0.9–1.1/m³. In other words, RO desalination above a few hundred cubic metres a day is already competitive with moving water inland.

3. Three numbers that matter more than the equipment price

The power tariff. Electricity is nearly half of the total, so dropping the tariff from USD 0.10 to USD 0.07/kWh removes USD 0.09–0.21/m³. Off-peak operation with storage, or on-site solar, pays back quickly.

Recovery ratio. Raising recovery from 30% to 40% cuts intake volume and pretreatment load, but increases concentration polarisation and scaling risk. The balance point must be calculated from actual salinity and temperature, not guessed.

Actual membrane life. A membrane designed for five years and replaced after two adds well over USD 0.07/m³ immediately. Around 90% of membrane life is determined by pretreatment and correct CIP practice.

4. Three ways to cut cost, ranked

  1. Fit energy recovery. One-off capital, 30–40% off specific energy, payback typically 1–3 years. The best-value money in the whole plant.
  2. Build pretreatment properly. Multimedia plus ultrafiltration plus antiscalant looks expensive but is the most effective way to extend membrane life.
  3. Add automatic control and remote monitoring. Fewer inspection rounds, and no more running the plant at abnormal pressure until the membranes are destroyed.
If you only want a rough figure: water cost ≈ tariff × specific energy ÷ 0.55. At USD 0.10/kWh and 3.5 kWh/m³ that gives about USD 0.64/m³. The formula folds in the empirical 55% electricity share and is good enough for a feasibility screen.

Shenzhen Duruofei Technology Co., Ltd. quotes the equipment list and an operating cost estimate together, so the customer sees the ten-year electricity and membrane bill before signing. Cheap equipment does not mean cheap water — that is the single point we most want to make clear.

Need a system sized for your site?

Send us the feed water source (seawater / brackish / tap), daily demand and installation location, and we will come back within 24 hours with a configuration and quotation.

Talk to an engineer